Руководитель обособленного подразделения( Инжиниринговый Центр Кронштадт )
Описание
PERSONAL INFORMATION
NAME:
Pavel Burnashov
E-MAIL:
moodyclerk@gmail.com
DRIVING LICENSE:
В category since 2006
EDUCATION:
Saratov State University named after N.G.Chernyshevsky, 2006.
Faculty of Mathematics and Mechanics
ADDITIONAL QUALIFICATION:
certificates can be provided on request
*
AMPP Certified Coating Inspector
*
Certificate as per API 5CT, 5L
*
SSPC Fireproofing Inspector
*
Certificate of Specialist in Welding Production II level: oil-and-gas production equipment, steel structures
*
VT - level II ISO 9712
*
UT - level II ISO 9712
*
Fluor approved inspector: Air-Cooled Heat Exchangers, Pressure Vessels, SQS report
*
RT - level II ISO 9712
PROFESSIONAL EXPERIENCE REVIEW:
QA/QC third-party inspection, supplier quality surveillance activities for various projects as consultant/freelancer in strict accordance with project's requirements. Took part in inspection of materials (pipes (main, gas-lift, casing), pipeline fittings, pipework, steel structure, steelwork), equipment (boiler installations of modular configuration, block and modular equipment, transformers, LACT package, valves, pumps, compressors), fiber optical cable, etc.
Worked as:
*
Senior inspector
*
Welding inspector
*
Coating/painting inspector
*
Supervisor
*
NDT inspector
*
Inspection coordinator
*
E&I inspector
*
Auditor
*
Third-Party Inspector
*
Mechanical inspector
*
Expeditor
Main duties:
*
Performing inspections in strict accordance with NORFI, ITP, approved procedures and specifications, design documentation, project's requirements;
*
Supervision and coordination of the working team activity;
*
Monitoring compliance with safety requirements;
*
Reviewing of certification and verification data for equipment used within the execution of a project, qualification documents of personnel involved in a project, material certificates, reports for performed testing and examination, document set completeness;
*
Monitoring over keeping of production technology on all stages;
*
Inspection of packing and storage conditions for materials in warehouses,
welding (before, in process, after), NDT equipment calibration and following NDT (visual, dimensional, UT, PT, MT, RT) examination, assembly, painting/coating, testing, FAT, preservation and packing activities, pre-shipment and shipping out activities;
*
Witnessing of sampling, mechanical testing, painting/coating testing, hydrotesting, leakage testing;
*
Issuing of release notices, non-conformity reports; daily, weekly reports based on inspection results;
*
Performing technical audit, vendor assessment;
*
Performing expediting activities.
CLIENTS AND PLANTS:
Participated in projects for Clients:
*
South Stream Transport BV
*
Sakhalin Energy Investment
*
Total
*
Transneft
*
Petrofac
*
STP S.p.A
*
Petroleum Pipe Company
*
Asia Gas Pipeline LLP
*
ТNК-ВР Holding
*
Caspian Pipeline Consortium
*
ТNК-ВР Management
*
Rosneft
*
Halliburton
*
Allseas
*
Siirtec Nigi
*
Fluor Corporation
*
CPECC
*
LUKOIL
*
KPJV/PJV/TCO
*
OCA Global
*
CB&I
*
Trans-Asia Gas Pipeline Company Ltd
*
RENCO
*
Chinese Oil and Gas Pipeline Engineering Corporation
*
SINOPEC Engineering (Group) Co., Ltd
EXPERIENCE:
Since 2006 till now QA/QC third-party inspection, auditing, expediting activities for various projects as Consultant/Freelancer.
HYOSUNG
September 2024 - Now
Project: AORC project, Inspection and supporting work in part of QA/QC, Moscow region, Russia.
VELESSTROY/ RusChemAlliance
April - September 2024
Project: GAS CHEMICAL COMPLEX PROJECT, LNG part, Inspection of production of boil-off gas compressors at KKM, Kazan, Russia.
Petronas
May 2024
Project: Kasawari Gas Development Project. Witness and inspection of the pull through test of Intelligent pigging at Vereco, Lukhovitsy, Russia.
PESCO / CC7
December 2023 - March 2024
Project: GAS CHEMICAL COMPLEX PROJECT, Inspection coordinator onsite during production of large соlumns at Deha Tech, Instanbul, Turkey
Renco
May - October 2023
Project: Waterline Astrakhan - Mangyshlak - Inspection of production, testing, painting, packing and shipping out of wedge gate valves DN50-1200 PN6.4 at the PTPA, Penza, Russia and the UZPA, Ust-Kamenogorsk, Kazakhstan.
OCA Global
March - April 2023
Project: OLEODUCTOS DEL VALLE S.A. DUPLICAR - ETAPA 1A - Inspection of packing, FAT of Fiber optic cabel at InCab, Perm, Russia
TCO/PJV
October 2020-October 2022
Project: Future Growth Project/Wellhead Pressure Management Project
(FGP/WPMP) - Inspection of manufacturing, testing and shipping out of LACT Metering package at OGSB, Kaliningrad, Russia
Petrofac
July 2020 - April 2021
Project: "Sakhalin energy OPF COMPRESSION PROJECT", Inspection of production, testing of "Portable methanol injection package" at Areopag LLC, Saint-Petersburg, Russia
CB&I
May - October 2020
Project: "DCU Project for LUKOIL Oil Refinery Plant in Kstovo", Inspection during production of "Steam Powered Pumps - Vessels" at SARRZ, Saratov, Russia
PJV
November 2019 - May 2020
Project: "TENGIZCHEVROIL FGP/WPMP PROJECT", Inspection of rotating equipment (pumps, cartridges, compressors) repair works, preservation at SULZER PUMPS RUS, Moscow, Russia
FLUOR CANADA
December 2019
Project: "PESCHANKA COPPER PROJECT", Expediting of supply of Medium Size Industrial Mobile Equipment, TechService, Nakhodka, Russia
STP Studi Tecnologie Progetti S.p.A
December 2019
Project: "USED LUBE OIL RE-REFINING", Inspection of соlumns internals at SULZER CHEMTECH, Serpukhov, Russia
LUKOIL
September-November 2019
Project: "Rakushechnoe field", Inspection of steel seamless pipes with external extruded PE based protective coating for offshore flowlines and trunk pipelines at OJSC "Volzhsky Pipe Plant", Volzhsky, Russia
FLUOR CANADA
September 2019
Project: "PESCHANKA COPPER PROJECT", Pre-shipment inspection of block modular equipment (Sewage Treatment Plant, Water Treatment Plant) at GidroPromTechnologiya, Tambov, Russia
KPJV
July - August 2019
Project: "TENGIZCHEVROIL FGP/WPMP PROJECT",
Supplier assessment audit at Siemens Transformers, Voronezh, Russia
Inspection of packaging of 35Kv vacuum circuit breakers at Shneider Electric\Electroshield, Samara, Russia
Groupe Genoyer
May 2019
Project: "Arctic LNG2", vendor audit at Liskimontazhkonstruktsiya, Liski, Russia
KPJV
March-June 2019
Project: "TENGIZCHEVROIL FGP/WPMP PROJECT", Inspection of 35Kv vacuum circuit breakers at Shneider Electric\Electroshield, Samara, Russia
FLUOR
November 2018 - March 2019
Project: "Arkutun-Dagi Source Water Well", Inspection of production and shipment of transformers at Shneider Electric\Electroshield, Samara, Russia
Siirtec Nigi
November 2018
Project: "Gas treatment plant", "CS Kazatchiya", Pre-shipment inspection of test bench for safety valves, FAT at TEKHNOTEST, Penza, Russia.
SINOPEC Engineering (Group) Co.
September - November 2018
Project: "Amursky gas processing plant", Inspection of FAT (hydraulic testing) of pressure vessels at TEKO-FILTER, Togliatti and RM Rail Ruzhimmash, Ruzaevka, Russia.
Rosneft
September - December 2018
Project: "Oil and gas condensate field "Russkoe", Inspection of production and shipment of block-type gas control units for CS "Heat boiler station 400Mv" at "Plant" Neftegazoborudovanie ", Saratov, Russia.
Halliburton
July - August 2018
Project: "KTL Turnaround 2018". Tengiz, Kazakhstan.
Allseas Group S.A.
February - March 2018
Project: "Turkish Stream - offshore pipeline". Inspection of steel longitudinal electro welded pipes as per DNV-OS-F101 и DNV-RP-F106 with 3-layer external anticorrosion polypropylene coating and internal flow coating at Multifunction marine transshipment complex "Bronka", Saint-Petersburg, Russia
Worrall Lees Associates Ltd
May 2017- February 2018
Project: "Turkish Stream - offshore pipeline". Inspection of slabs production for manufacture of pipes for "South Stream Transport BV" at "Cherepovets Steel Mill" (PAO Severstal), Cherepovets, Vologda region, Russia
Swiss Engineering Group LLC
August 2016 - May 2017
Project: Inspection of steel structures, block type horizontal air-cooled heat exchangers, block and modular equipment, gantry cranes production at "ChelyabStroyKon" Zlatoust, Chelyabinsk region, Russia. for JSC "Rosneft"
Intertek-Moody International
February - August 2016
Project: Linde Gas, Inspection of production of vessels at the plant "Komsomoletz" project Nizhnekamsk-H2 hydrogen production. Tambov region Russia.
Engineering bureau Franke International
July 2015 - February 2016
Project: Inspection of plates production for OJSC at OJSC , Novotroitsk, Orenburg region, Russia
Intertek-Moody International
January - June 2015
Project: JSC "Transneft". Technical inspection of manufacture and tests of boiler installation in modular configuration 12 megawatt. ZAO "Permneftegasservis", Russia, Perm city
Worrall Lees Associates Ltd
February - December 2014
Project: "South Stream - offshore pipeline".
Inspection of steel plates production as per DNV-OS-F101 for "South Stream Transport BV" at "Cherepovets Steel Mill" (PAO Severstal), Kolpino, Saint-Petersburg, Russia.
Inspection of steel longitudinal electro welded pipes as per DNV-OS-F101 and DNV-RP-F106 with 3-layer external anticorrosion polypropylene coating and internal flow coating for "South Stream Transport BV" at "Izhora Pipe Mill" (PAO Severstal), Kolpino, Saint-Petersburg, Russia.
Intertek-Moody International
September 2012 - October 2013
Projects:
"Increase of capacity of the "Kazajhstan-China" main gas pipeline (The first section)". Inspection during manufacturing of longitudinal pipes as per API 5L performed by SAW method with 3-layer external anticorrosion coating and internal plain coating for "Asia Gas Pipeline" LLP at PJSC "Khartsyzsk Tube Works", Khartsyzsk, Donetsk region, Ukraine.
"Increase of capacity of the "Uzbekistan-China" main gas pipeline (The first section)". Inspection during manufacturing of longitudinal pipes as per API 5L performed by SAW method with 3-layer external anticorrosion coating and internal plain coating for "Trans-Asia Gas Pipeline Company Limited" at PJSC "Khartsyzsk Tube Works", Khartsyzsk, Donetsk region, Ukraine.
Swiss Engineering Group LLC
November 2009 - August 2012
Projects: Inspection of production of pipeline fittings for JSC "Transneft" at CJSC "Trubodetal", Chelyabinsk, Russia
Inspection during manufacturing of steel longitudinal electro welded pipes with 3-layer external anticorrosion polyethylene coating and internal flow coating for JSC "Transneft" at "Izhora Pipe Mill" (PAO Severstal), Kolpino, Saint-Petersburg, Russia.
Moody International
September 2006 - November 2009
Projects: Inspection of tubing fabrication for OJSC "TNK-BP" at CJSC "Interpipe Nikotube", Nikopol, Ukraine
Construction of Middle Asia Pipeline. Inspection during manufacturing of oil and gas pipes as per API 5L and Customer's Specifications at OJSC "Vyksa Steelworks", Vyksa, Russia
"Kenkiyak-Kumkol". Inspection during manufacturing of oil and gas pipes as per API 5L and Customer's Specifications at PJSC "Khartsyzsk Tube Works", Khartsyzsk, Ukraine.
"Caspian Pipeline Consortium". Construction project for pipeline section 0 - 116 km. Inspection during manufacturing of longitudinal pipes as per API 5L performed by SAW method with 3-layer external anticorrosion coating at OJSC "Chelyabinsk Tube Rolling Plant", Chelyabinsk, Russia.
"TNK-BP Management". Inspection of line pipes production at OJSC "Vyksa Steel Works", Vyksa, Nizhniy Novgorod region, Russia.
"TNK-BP Management". Construction project for trunk pipeline at Verchne-Ochonskoye Field. Inspection of line pipes production at OJSC "Volzhsky Pipe Plant", Russia
1 сентября, 2017
Вадим
Город
Калининград
Возраст
52 года (26 сентября 1972)
24 июля, 2023
Надежда
Город
Калининград
Возраст
54 года ( 7 июля 2025)
25 июля, 2023
Оксана
Город
Калининград
Возраст
55 лет ( 7 июля 2025)